In 2000, EPG took the guide in attaining ISO14001 surroundings management certificate and thereafter handed the inspection of thoroughly clean production and recycling economy, profitable the title of “Zhejiang Green Company”. Support & Top quality controlWe supply in depth drawings and offer whenever essential. Additionally, all our generation methods are in compliance with ISO9002 specifications.
Firm Introduction
We are focus on all kinds of rack and pinion driving vertical accessibility EPTTry and EPTT design and style, answer and OEM to all clients all above the globe!
Builder’s hoist, EPTT crane mini hoist, EPTT raise, mast climbing platform, Mast climber.
500kg-3000kg loading potential passenger cum substance constriction web site constructing carry
Its principal goods incEPTT:
PLC development lifts.
Reduced, medium, and high-velocity variable frequency construction lifts.
EPTT objective development lifts, such as EPTT EPTT chilly h2o tower building lifts, mini rack design lifts for tower crane, and EPTT design lifts.
Inclined design lifts.
Tiny rack observation elevate.
Higher-level examination mattress maintenance carry.
Other OEM kind rack and pinion vertical lift.
EPTTful tasks:
Our rack and pinion hoist have sent to a lot more than 30 nations around the world and get properly feedbacks from them!
Item description
Frequent PLC Management Development creating hoist :
Specification |
Kind |
EPTT Ability |
EPTT Velocity |
EPTT EPTT |
Safety Unit |
Single cage with out counter excess weight |
SC100 |
1000Kg |
33m/min |
two*11Kw |
SAJ thirty-1.two |
SC150 |
1500Kg |
two times13Kw |
SAJ forty-one.two |
||
SC200 |
2000Kg |
3 times11Kw |
SAJ 40-1.2 |
||
Twin cages with out counter weight |
SC100/100 |
1000KEPTTimes2EA |
2 times11Kw times2EA |
SAJ 30-one.2 |
|
SC150/one hundred fifty |
1500KEPTTimes2EA |
2 times13Kw times2EA |
SAJ 40-one.2 |
||
SC200/200 |
2000KEPTTimes2EA |
3 times11Kw times2EA |
SAJ forty-1.two |
Construction rack and pinion elevator of Reduced pace :
Specification |
Variety |
EPTT Potential |
EPTT Speed |
EPTT EPTT |
VFD |
Protection Unit |
Solitary cage with out counter weight |
SC100L |
1000Kg |
~33m/min ~40m/min |
2 times11Kw |
30Kw |
SAJ thirty-1.2 |
SC150L |
1500Kg |
~36m/min ~46m/min |
2 times13Kw two times15Kw |
30Kw 37Kw |
SAJ forty-one.two |
|
SC200L |
2000Kg |
~40m/min ~46m/min |
2 times15Kw three times11Kw |
37Kw |
SAJ 40-one.2 |
|
Twin cages with no counter bodyweight |
SC100/100L |
1000KEPTTimes2EA |
~40m/min |
2 times11Kw times2EA |
30Kw times2EA |
SAJ 30-1.2 |
SC150/150L |
1500KEPTTimes2EA |
~36m/min ~46m/min |
2 times13Kw times2EA2 times15Kw times2EA |
30Kw times2EA37Kw times2EA |
SAJ 40-1.two |
|
SC200/200L |
2000KEPTTimes2EA |
~40m/min ~46m/min |
two times15Kw times2EA2 times11Kw times2EA |
37Kw times2EA |
SAJ 40-1.2 |
Design rack and pinion elevator of Mediaum pace :
Specification |
Variety |
EPTT Ability |
Lifiting Pace |
EPTT EPTT |
VFD |
Basic safety device |
One cage with out counter fat |
SC 100 M |
1000Kg |
~60m/min |
3 times13Kw |
45Kw |
SAJ thirty-1.four |
SC a hundred and fifty M |
1500Kg |
~63m/min ~60m/min |
3 times15Kw 2x19Kw(87Hz) |
45Kw 55Kw |
SAJ 40-one.four |
|
SC two hundred M |
2000Kg |
~60m/min ~63m/min ~70m/min ~75m/min |
two times23Kw(87Hz) 3 times15Kw three times19Kw(87Hz) three times23Kw(87Hz) |
55Kw 55Kw 75Kw 75Kw |
SAJ 40-one.4 SAJ50-1.6 SAJ50-one.six SAJ50-1.six |
|
Twin cages without counter fat |
SC 100/100 M |
1000KEPTTimes2EA |
~60m/min |
three times13Kw times2EA |
45Kw |
SAJ thirty-1.four |
SC a hundred and fifty/150 M |
1500KEPTTimes2EA |
~63m/min ~60m/min |
three times15Kw times2EA 2x19Kwx2EA |
45Kw 55Kw |
SAJ 40-one.4 |
|
SC 200/200 M |
2000KEPTTimes2EA |
~60m/min ~63m/min ~70m/min ~75m/min |
two times23Kw times2EA(87Hz)3 times15Kw times2EA 3 times19Kw times2EA(87Hz)three times23Kw times2EA(87Hz) |
55Kw 55Kw 75Kw 75Kw |
SAJ 40-one.four SAJ50-1.6 SAJ50-1.six SAJ50-2. |
Construction rack and pinion elevator of HigEPTT velocity :
Specification |
Variety |
EPTT Ability |
Lifiting Velocity |
EPTT EPTT |
VFD |
Protection system |
One cage with no counter fat |
SC 200 H |
2000Kg |
~80m/min ~96m/min |
three times26(87Hz) three times18.five(87Hz) |
90Kw 110Kw |
SAJ 50-two. |
Twin cage with no counter weight |
SC two hundred/200 H |
2000KEPTTimes2EA |
~80m/min ~96m/min |
2 times3 times26(87Hz) 2 times3 times18.five(87Hz) |
90Kw times2EA 110Kw times2EA |
SAJ 50-two. |
one.StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd cage interior size: 3000 times1500 times2200mm(L timesB timesH)
2.Cage Length can be OEM: a thousand~4500 mm
3.Mast EPTT size: 650 times650mm
4.MaXiHu (West Lake) Dis.mum EPTT Peak: 450m
five.EPTT Supply: 220V~380V~480V,50Hz/ 60Hz
Cage amp Cabin.
The cage can be produced according to consumers requirement. small or huge type all ok for us.
Mast EPTT.
various sort of mast EPTT we can supply, like 650*650*1508mm, 650*200*1508mm, 650*1508 flat kind, 650*900*1508mm, 450*450*1508mm, 800*800*1508mm sort and so on.
Cage metal body.
All steel frames are welding fastened within Jig to preserve each item in accordance to method prerequisite
Enclosure: different sort can be selected like wire mesh materials, steel punched sort, ex-metal plate sort…
Driving EPTTry is really EPTTant , it will affect the easily and regular working, we pay a lot more consideration to every particulars.
All EPTT portion are chosen by us, and schneiEPTTbrand is our stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd kind for client…, take a look at and inspection inside factory need to be taken just before loading.
Concluded protection actions for development constructing hoist
1. Equipping with Anti-falling safety unit governor
two. EPT an EPTT interlock: Door basic safety switches, Slack rope change
3. Basic safety hook
4. Upper and bottom restrict switches, lure doorway limit swap
5. Overload protector
6. Base Buffer
7. Degree Contacting technique and vehicle leveling system to be choose.
eight. Ramp door for (Ex.door of cage).
Maker EPTT
Proffessional Company of rack and pinion developing hoist.
1. -All Generation Line undertake EPTT fixture, mould, gauge created by us to make certain all comprehensive dimensions.
2.- Choose higher high quality uncooked materials from EPTT Bao Metal Group, other like motors ,EPTTs, EPTT, protection system with lower sound, electrics is schneiEPTTor Korea repute brand with trustworthy good quality
three.- EPTT style,compact and realistic framework,effortless to set up and adjustment.
four.- Each and every gear should be take a look at and make document in Factory, all details will be alter like motor brake, protection unit procedure, all limit change operation, dropping examination, loading examination, and mast EPTT erection test to make sure the finished equipment run well when consider into use.
EPTT elements ampService
99.eight% Reaction Fee
ninety six.8% Reaction Charge
We EPTT all development developing hoist with one yr guarantee interval from shipping and delivery, and can provide a Engineer for oversea’s set up and upkeep, trHangEPTT or website direction.