Additionally, all our generation methods are in compliance with ISO9002 requirements. Hangzhou EPG Co.,Ltd. , was started in November, 1997. With its five wholly owned subsidiaries. We are looking forward to developing effective organization interactions with new clientele about the entire world in the long term.
300m Borehole Drinking water Drilling Rig EPTT with EPTchai Engine
Application
CSD300 Multi-useful EPTT mounted h2o effectively drilling rig is a efficient,multi-perform complete EPTT h2o effectively
drilling rig.It is large effectiveness due to the fact of possessing a greater torque of the turntable and is primarily utilised for h2o well in
market and EPTT, national protection developing foundation, geological exploration, geothermic nicely and other
basis functioning, it is popular at home and overseas.
CSD300 EPTT mounted drilling rig can drilling in all kinds formations by mEPTTdrilling in soft formation and air DTH
hammer in rock drilling,DTH Hammer is used in rock drilling, slag is discharged by air pressure and the offstage
performance is ten occasions than conventional rotary drilling.
CSD300 deep h2o properly drilling rigs, in reducing drilling or rotary drilling can be operated in unconsolidated layer, and
the slag can be discharged unEPTTby mud, the impact drilling operation can also be adopted and slag can be discharged
by force air, the EPTT drinking water effectively drilling rig suitable for drilling challenging geological circumstances.
Traits
one.The drilling rig can use air DTH Hammer drilling and mEPTTdrilling.
2.Centralized management console is suitable for each manipulation and control. Quick pulling and lifting decrease the
auXiHu (West Lake) Dis.liary time and boost the work effectiveness.
3.The EPTT chassis adopts the 4X2 EPTT crane chassis of manufacturer EPTTEPTT EPTT and the principal EPTT technique, the
transfer situation, EPTT, double-winch device, mEPTTpump, turntable,drilling tower, feed system are established up on the chassis.
four.It really is a EPTTrotary drilling rig with directional circulation. It is outfitted with BW250/BW450(Optional) mud
pump which adopts the slurry as the washing fluid and can drill on clay, sand and rock if it is equipped with ideal
drilling little bit.
5.The EPTT of drilling rig arrives from a EPTchai engine,93kw EPTchai engine EPTTs the massive displacement high
stress plunger pump and it is characterized by EPTTful dynamic and steady performance.
6.The rotary head,rotation velocity is -100rpm stepless adjustment and the rotary torque is 3200-4500Nm.
seven.The pulling force can be regulated and controlled, which adapt the EPTT to deep gap drilling.
8.It can established up a generator which is practical to welding or illuminate for perform at evening.
nine.Primary winch are obtainable on the rig so it is high efficiency when the rig drill on mEPTTrock and on the weathering
formation.
10.The main EPTT of rig is hydrulic and the 4 lXiHu (West Lake) Dis.Hu (West Lake) Dis. legs and drilling tower are EPTT managed. Transfer situation
and mEPTTpump clutch system are also EPTT operated.
eleven.The tools winch winch is employed for auXiHu (West Lake) Dis.liary lifting and casing,optional major winch power of 1.5T, rope length of
100m.
12.The EPTT auXiHu (West Lake) Dis.liary capabilities are straightforward and effective for XiHu (West Lake) Dis.Hu (West Lake) Dis. extension, increase swing, growth raise, XiHu (West Lake) Dis.Hu (West Lake) Dis.
dumping.
Specification
one | Geology drilled | All kinds | |
2 | Drilling variety | DTH amp MEPTTrotary | |
3 | Drill system and procedure | EPTT | |
four | Gap Diameter | mm | Phi90- Phi325 |
5 | Gap Depth | m | 300 |
6 | Rotation Torque | Nm | 4500-8500 |
7 | Rotation Velocity | rpm | -one hundred |
8 | Drill pipe diameter | mm | 76,89,102,114 |
9 | Drill pipe size | mm | 3000/4500/6000 |
ten | Max. EPTT drive | N | 8000 |
11 | Max. Feed Velocity | m/min | eighteen |
twelve | Feed Stroke | mm | 3400 |
Winch | |||
13 | EPTT drive of hoist | T | .8 |
fourteen | Duration of steel wire rope(device winch) | M | one hundred |
Engine | |||
15 | EPTT Engine sort | YUCHAI | |
16 | Rated Horse EPTT | Kw | ninety three |
17 | EPT Technique | V | 24 |
Compressor Essential | |||
18 | Compressor Type | Rotary Screw/Movable | |
19 | Stress Necessary | Mpa | 1.two-3. |
20 | Air intake | m sup3/min | 11-35 |
EPTT | |||
21 | Maker | EPTTEPTT/XiHu (West Lake) Dis.HU (WEST LAKE) DIS.FENG | |
22 | Product | E13N2B00098 | |
23 | Engine | YC4E140-forty two | |
24 | Rated Horse EPTT | HP | one hundred forty |
25 | Discharge StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd | EU-2 | |
26 | Push variety | four*2 | |
27 | Max.Velocity | Km/h | 102.9 |
28 | Steering wheel | still left/appropriate(Optional) | |
MEPTTEPTT(Optional) | |||
29 | Variety | EPTT | |
30 | Design | BW450 | |
31 | Stroke | mm | one hundred ten |
32 | Displacement | L/Min | 450 |
33 | Discharge strain (Mpa) | Mpa | two-5 |
34 | Suction tube diameter | mm | 89 |
35 | Discharge pipe diameter | mm | 51 |
36 | Liner Diameter | mm | eighty |
Dimension | |||
37 | Web Excess weight | T | 15 |
38 | EPTT Duration | mm | 10600 |
39 | EPTT Width | mm | 2400 |
forty | EPTT Top | mm | 3050 |
41 | Functioning measurement(L*W*H) | mm | 11000*2480*2850 |
EPTT amp Supply
Provider
In our right after sales services method, We establish excellent management method strictly in accordance to ISO-9000 collection, in this technique, EPTT date and difficulty solve resolution and preventive measures will be offered in any maintain project, all the spare elements will be utilised in new OEM goods with set up recommendations, EPTT listing, manufacturer’s instruction, qualification and Guarantee certification.
We supply quotone tools amp 1 circumstance, limitless support, specifically the following revenue provider start from the orEPTTconfirmation, final for the working daily life of the gear.