We are aiming to meet up with the demands of the consumers close to the entire world.. The solution well displays environmental security and strength preserving. Wonderful attention has been compensated on environmental safety and strength saving. We can customized EPT as your requirement
Item description of Guiena employed 828 roofing stage glazed tile roll forming EPT
Glazed tile roll forming EPT is 1 of our main products, it is a lot more and much more well-known in recent many years due to the fact it truly is beautiful in look amp EPT in design. We are a extremely professional company of glazed tile roll forming EPT, with mature technique and much more than 23 years’ expertise, our EPTs have been despatched to a lot of international locations all about the world and acquired a very good popularity for us.
This kind of EPT is quite common and frequent utilised in recent years
Equivalent EPT probably u like:
Operating approach
The total line incEPTs decoiler, forming EPT, laptop controlling system and run out tables. Our EPTs are outfitted with a computer controlling method to maintain merchandise accurate.
Primary parameter
NO |
Type |
Specification | |
1 |
Uncooked materials | Type | PPGI |
Feeding material width | 1250 mm | ||
Thickness | .3-.8 mm or as customer’s ask for | ||
2 |
Decoiler | Procedure | Manual |
WeigEPT apacity | five Tons | ||
three |
Major human body | Roller station | twelve row |
Diameter of shaft | 75 mm | ||
Shaft material | forty five# with .05mm chrome | ||
Roller content | 45# with .05mm chrome | ||
Type | EPT sort | ||
Frame | 350mm C-beam | ||
Body thickness | sixteen mm | ||
EPT | Cr twelve | ||
Operation | EPT automated | ||
Working velocity | Frequent 3-five m/min Servo motor 6-10m/min |
||
4 |
EPT | Driving way | one.2 inch EPT |
Main motor | five.5 KW | ||
EPT station EPT | seven.5 KW | ||
Voltage | 380V/50HZ, three section | ||
five |
Handle box | Electrical box | PLC control program, invEPTr |
PLC brand | Delta produced in EPTiwan | ||
Inverter model | Delta created in EPTiwan | ||
Language | EPT and EPT |
Manual decoiler
It is passive kind could load coil by expend the blots resolve at coil inner diameter. It is straightforward to run and inexpensive answer.
XiHu (West Lake) Dis.hu (West Lake) Dis. unit
Undertake XiHu (West Lake) Dis.Hu (West Lake) Dis. bar and sliding block to handle the width and place of the metal sheet. The coil is XiHu (West Lake) Dis.Hu (West Lake) Dis.d in the proper position and handed to the roll forming technique. Can modify the XiHu (West Lake) Dis.Hu (West Lake) Dis. bar with loosing the fiXiHu (West Lake) Dis.ng bolts to feed sheet in rigEPT place. It truly is set framework to make confident can not go easily.
Roll Forming Program:
Roll forming system consist of EPT body, EPT program, EPT motor and roll forming system.
A. EPT body adopts welding structure with shot blasting and portray therapy
B. All rollers material undertake high quality No. 45 metal, with challenging chrome coated on area, all treatment method by total CNC EPTs, to make positive the rollers with excellent rigidity and precision, and form excellent roofing sheet as per style.
C. All rolling shafts are produced by substantial good quality No. 45 steel with quench and temper treatment, so the shafts with very good rigidity which could use for EPT tern with out deformation.
D. Rolling shafting supporting structure kind is metal wall and welded with the basement collectively to have rigidity.
E. Cycloidal pin EPT speed EPT motor EPTn, the back/EPT roller EPTn by EPT, component of higher/reduce rollers EPTn by EPT
F. Change the screw bar manually to alter the distance between higher/decrease rollers for big difference thickness of sheet.
(Interest: all rolling program has modified in our company as a perfect circumstance, we never suggest to change the rollers at random, if necessary, must alter by a skilled technician or following practice by our engineer. Normally will trigger the EPT can not form a good profile
Chopping unit
A. Adopts put up reducing, the cutting blade content is Cr12 with quenched treatment, soon after chopping, there is no substance wasted.
B. Adopts welded frame for excellent rigidity.
C. The chopping action is droved by the EPT from EPT station which ensures the procession of the slicing and reduced noisy, EPT lifestyle.
EPT Method
It is controlled by EPT wheel oil pump. Soon after filling the EPT oil into the EPT oil tank, the pumps EPT the cutter EPT to get started the chopping occupation.
The method incEPTs a established of EPT tank, a set of EPT oil pump, two EPT pipes. And two sets of electromagnetism valves.
EPT of the oil pump: 3kw
EPT oil: forty#
PLC control system
It adopts EPT laptop to manage. The goal piece’s length is adjustable and digit of it can be adjusted. Computed mode has two modes: computerized and manual 1. The program is effortless to function and use.
Processing precision: within one.00mm
It is made up of liquid crystal EPT, programmer, transformer for the electronic EPTs and kits of every portion. Touch EPT
PLC is EPTiwan Panasonic
Transducer manufacturer is EPTiwan Delta
The vendor need to give EPT and EPT language EPT
Counter
A single counter gauges length, pulses, and decides duration.
Perform measures
To check out EPT online video or more particulars, get in touch with with me
We EPT market to lots of nations
Our certification
Business data
EPT team is a specialist manufacturer developing and producing roll forming EPTs estabEPTd in June 1996. We have four factories operating in BeiEPTg, TianEPT and ZheJiang province. Far more than 400 employees supply provider for u.
EPT primarily incEPT trapezoidal steel roof/wall panel EPT, C ampZ form purline EPT, freeway guardrail EPT, sandwich panel creation line, deck forming EPT, C U L ligEPT keel EPT, shutter slat door forming EPT, reducing EPT, downpipe EPT, gutter EPT, and many others.
How to visit us?
Our service
one. Free of charge specialized help and free add-ons supply.
2. Engineer available to provider EPTry overEPT.
three. 1 calendar year warranty is offered.
four. EPT daily life specialized guidance for totally free.
five. We alwaEPToffer technical assist, fast response, all your inquire will be replied in 24 hours.
Question amp Answer
1. Q: How to pay a visit to our firm:
A: Fly to BeiEPTg Airport: By rapidly teach From BeiEPTg South station to HangEPT west station
(1hour), then we can choose up you to manufacturing facility(40min).
B: Fly to ZheJiang Airport: By rapidly prepare From ZheJiang XiHu (West Lake) Dis.hu (West Lake) Dis.ao station to HangEPT west
station(4.5 several hours), then we can choose up you to manufacturing unit(40min).
2. Q: What should I supply if I want to customized EPT?
A: U need to have provide profile drawing, substance, thickness, voltage and your EPT specifications.
three. Q: What is the Guarantee?
A: In 12 mounts, all technicals are prepared to provide you at any time.
4. Q: What can you do if the EPT damaged?
A: Our EPT’s guarantee time period is twelve months, if the damaged areas can’t restore, we will deliver
new components change the broken parts totally free, but you need pay the categorical EPT if following guarantee period. we can negotiate to resolve the difficulty, and we provide the technical assist for EPT existence of products.
five. Q: If require technician to workshop to debug and teach, how to do?
A: We despatched technician to your country to fix the EPT. Consumer ought to bear EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis.: visa, round vacation ticket and suitable lodging, also buyer need to pay the wage 100 USD/day.