Total use has been produced of all types of innovative strategies and technological innovation to get to excelsior producing. Service & High quality controlWe offer in depth drawings and provide every time needed. We also can design and make non-standard merchandise to meet customers’ specific needs. 6t creating tower crane topless tower crane QTZ63(PT5610)
one. max. lifting capacity(t)6t
two. max. functioning assortment(m)56m
three. max. lifting capability at jib idea (t)one.0T
four. standard height (m)40 m
5. max. top (m)150m
six. dimension of EPTT (m)one.eight times1.8 times2.eight
seven. materials of mast EPTT #8736160 times160 times16/Q345B
Loading chart
two falls
Jib duration m | 3-25.fifty seven | 26 | 27 | 28 | 29 | thirty | 31 | 32 | 33 |
Load t | three | 2.941 | two.809 | 2.687 | 2.574 | 2.468 | two.369 | two.276 | two.188 |
Jib length m | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 |
Load t | two.106 | 2.571 | one.955 | 1.886 | 1.821 | one.758 | one.699 | one.643 | one.589 |
Jib length m | forty three | forty four | 45 | 46 | 47 | 48 | 49 | 50 | fifty one |
Load t | 1.538 | one.489 | one.443 | 1.398 | one.356 | 1.315 | 1.276 | 1.238 | one.202 |
Jib duration m | 52 | 53 | fifty four | 55 | fifty six | ||||
Load t | 1.167 | one.133 | 1.a hundred and one | 1.070 | 1.040 |
four falls
Jib duration m | 3-fourteen.22 | fifteen | sixteen | 17 | 18 | 19 | 20 | 21 | 22 |
Load t | six | five.652 | five.256 | four.906 | 4.595 | four.317 | 4.067 | three.840 | 3.634 |
Jib duration m | 23 | 24 | twenty five | 26 | 27 | 28 | 29 | 30 | 31 |
Load t | three.446 | 3.274 | three.116 | 2.969 | two.834 | two.708 | two.591 | 2.482 | two.379 |
Jib length m | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | forty |
Load t | two.283 | 2.193 | 2.109 | 2.571 | one.953 | 1.882 | one.814 | 1.750 | one.689 |
Jib size m | 41 | forty two | forty three | 44 | forty five | forty six | 47 | 48 | forty nine |
Load t | one.631 | 1.576 | 1.523 | one.473 | 1.425 | 1.379 | 1.335 | 1.293 | one.252 |
Jib length m | 50 | fifty one | fifty two | fifty three | fifty four | 55 | 56 | ||
Load t | 1.213 | 1.176 | 1.one hundred forty | 1.106 | 1.072 | one.040 | one.009 |
3. Technical performances
Rated lifting torque | kN.m | 630 | |||
Max. lifting potential | t | six | |||
Doing work assortment | m | 3~fifty six | |||
EPTT Top | Independent | forty.2 | |||
Adhered | 151.two | ||||
EPTT pace | two falls | m/min | eighty/40 | ||
four falls | 38/19 | ||||
EPTT pace | r/min | .637 | |||
Trolleying speed | m/min | forty four/22 | |||
Climbing pace | .4 | ||||
Min. steady descending speed | lt7 | ||||
Outer measurement of EPTT crane | Basis body | m | 8 times8 | ||
All round peak | Impartial | fifty.892 | |||
Adhered | a hundred and sixty.892 | ||||
Tip of jib to the slewing cEPTTr | fifty six.17 | ||||
Tip of balanced jib to slewing cEPTTr | twelve.39 | ||||
Whole weigEPTT | Structure weight | Independent | t | forty.forty nine | |
Adhered | 80.87 | ||||
counterweight | 18.34 | ||||
Complete motor capability | kW | forty one.fifty two | |||
Authorized operating temperature | ordmC | -twenty~ forty | |||
EPTT provide parameters | 50Hz | ~380V plusmn10% |
Major tech data of mechanisms
EPTT load issue | EPTTing system | M5 | |||
EPTT mechanism | M4 | ||||
Trolleying mechanism | M4 | ||||
EPTTing mechanism | EPTT | Product | YEPTD200L-2/four/20 | ||
EPTT(kw) | 24/24/4.5 | ||||
HeigEPTT limiter | Product | FKDX-G | |||
Metal wire rope | Design | 6X19-12.five-1770-I | |||
Max. pulling pressure (N) | 15000 | ||||
Magnification | a=two | a=4 | |||
EPTT Velocity (m/min) | 80 | 40 | 38 | 19 | |
Rated lifting capacity(t) | one. | three | two.four | 6 | |
Min. secure descending velocity | m/min | lt7 | |||
EPTT system | EPTT | Model | YZR132M2-six | ||
EPTT (kW) | three.seven times2 | ||||
Rotation speed (r/min) | 908 | ||||
EPTT | product | XX4-100A | |||
ration | 195 | ||||
EPTT couplings | Design | YOX250A | |||
Hinge pins of swiveling | Modulus m | twelve | |||
Enamel z | 15 | ||||
Displacement issue | .five | ||||
EPTT velocity | r/min | .61887 | |||
EPTT bearings | StraigEPTT 4-stage get in touch with ball kind bearings | Product | 011 middot45 middot1400 | ||
modulus m | twelve | ||||
tooth z | 131 | ||||
EPTT jacking system |
EPTT | Design | Y132M-4B5 | ||
EPTT(kW) | five.5 | ||||
Running push of EPTT oil tank | Mpa | twenty five | |||
Max. lifting power | t | 50 | |||
CylinEPTTstroke | mm | 1600 | |||
Mounting area | mm | 2070 | |||
Diameter of oil tank | mm | phi160 | |||
Diameter of cylinEPTTpiston rod | mm | phi110 | |||
Climbing velocity | m/min | .four | |||
Trolleying mechanism | EPTT | Design | YDEZ132S-four/8 | ||
EPTT (kw) | four.five/3 | ||||
Steer wire rope | Model | 6 times19-seven.seven-1550 | |||
EPTT | Variety | BL22-forty three-three.three | |||
Equipment ratio | 43 | ||||
Velocity | m/min | forty three.three/21.nine |
Advantage of EPTT Crane
one.Robot automated welding program
2.EPTT impeller blasting and spraying assembly line
three.CNC plasma chopping EPTT
four.EPTT EPTT tools
5.France SchneiEPTTcontactor
six.EPTTngte motor
7.Geared up with comprehensive established of basic safety units
eight.CE and ISO 9001:2000 certification
EPTT amp EPTT
EPTT in 40HC container.
If undertake CIF, we will uncover better delivery company for clientele
Shipping and delivery time
Providing well timed delivery, following 30% EPTT payment By T/T , inside 5-15 functioning daEPTTarrange delivery .
Our providers
one.Customized provider.
We can do all EPTT design in accordance to your need
two.Welcome pay a visit to our manufacturing unit, learn about our factory and products.
three.24 hours on line or phone , complex assist
Soon after sale service:
one.The vendor will send out 1 of her expert specialists to the site of consumer to XiHu (West Lake) Dis.Hu (West Lake) Dis. the erecting operate.
2.12(twelve)months (apart from for wire rope and AC contactor) right after the tools be effectively erected and we will supply spare elements EPTT yr EPTT.
three.LifeEPTT time freely give specialized assistance .
FAQ
Q1: No matter whether you can provide EPT items?
A1: Indeed. We are hello-tech EPTTrprise affiliated to EPTT Academy of Building EPTT. We have a team of engineers, who have title of professor , senior engineer and engineer. We can give you EPTT design as for each the drawings of your developing, assisting you solve diverse problems confronted in your assignments.
Q2: Whether or not EPT items will take a extremely EPTT time to design and manufacture?
A2: Not exactly. Usually for us, some amendment in design and style to adapt your necessity will get a single 7 days. so even for your EPTT task, it will be about 30-forty times shipping time.
Q3: What is the brand name of your essential factors?
A3: EPTT: HangEPTTng from Shangai, EPTT: XiHu (West Lake) Dis.ngXiHu (West Lake) Dis.ang from HangEPTT, Inverter: Zhengxuan from HangEPTT and ABB or Schneider can also be choosed.
Other EPTT elements: Schneider or Simens
EPTT laning program: Weikong of EPTEPTTn for construction hoist
Q4: What variety of solutions you can supply?
A4: We are dealing with building EPTTry for about 15 yr. High high quality is our gain, and higher EPTT is our core competency. We ensure that all the EPTT have been completely analyzed in our factory before delivery. We will give you one particular 12 months guarantee for complete EPTT. For problems induced by our generation defect, we will offer you free companies by sending experienced engineer there.